Specialists of the design workshop Special Section will carry out adjustments to design documentation of any level of complexity in the shortest possible time.

Adjustment is necessary in case of changes in the technical specifications for the development of project documentation, changes in planning, design solutions, purpose of buildings, heights, areas, etc.

In some cases, adjustments to design and estimate documentation are prescribed by state supervisory authorities to eliminate inconsistencies with current standards. In addition, its goal may be to minimize costs, eliminate detected errors and reduce construction time.

Our design team is ready to carry out both adjustments to the entire project and adjustments to individual sections of the project documentation. For example, the customer decided to install an additional boiler room, and the project provided for heat supply from the city network.

To successfully pass such a project in the examination bodies, it is necessary to supplement the project documentation with sections: reduction of the sanitary protection zone (SPZ reduction project), adjust the section list of environmental protection measures (PM EOS), adjust fire safety measures (MOFS), develop a section industrial safety, etc.

Adjustments to design documentation can be made both in the project being designed and in a project that has passed state/non-state examination of design documentation. In the second case, you will need to go through the design documentation again.

Our design workshop specialists have extensive experience in making adjustments to design documentation. They will carefully study existing plans, analyze the scope of work and complete the task within the minimum time, which will help avoid significant deviations from the construction schedule. In addition, Special Section employees can search for additional errors and deviations from standards in order to determine the need to adjust project documentation before approval. Thanks to this, the customer will significantly reduce unproductive time losses and material costs.

To calculate the cost and completion time, you need to contact the specialists of the Special Section design workshop to clarify the needs, parameters and type of work. Processing and settlement of the application takes no more than 2 hours during business hours. The qualifications of our employees allow us to make calculations as transparent and informative as possible for our clients to quickly make decisions.

If we do not respond to you within 2 hours, we guarantee you a 10% discount on the full cost of the work. To do this, please write to

In accordance with the Town Planning Code of the Russian Federation (Article 48, clause 12.1.), the preparation of project documentation at the initiative of the developer or technical customer can be carried out in relation to individual stages of construction and reconstruction of capital construction projects.

The construction stage means the construction of one of the capital construction projects, the construction of which is planned to be carried out on one land plot, if such an object can be put into operation and operated autonomously, that is, regardless of the construction of other capital construction projects on this land plot, as well as the construction of part capital construction project, which can be put into operation and operated autonomously, that is, independently of the construction of other parts of this capital construction project.

Design and working documentation

The question naturally arises: if all these actions constitute the project stage, then why was it divided into two parts. The answer may be that in this way the legislator wanted to speed up the starting phase of the investment cycle. To obtain permission to carry out construction work, high-quality design documentation is sufficient, which can be expertly studied without going into unnecessary details. After the state examination has been carried out and all comments have been corrected, working issues can be worked out.

  • explanatory note;
  • layout of the allocated plot of land;
  • architectural solutions;
  • space-planning and structural solutions;
  • data on utility networks (water and electricity supply, drainage, air conditioning and ventilation, heating and heating networks, gas supply, communications);
  • organization of construction (project);
  • dismantling of capital facilities (project);
  • environmental protection measures;
  • fire safety measures;
  • accessibility for disabled people;
  • energy efficiency and availability of energy metering devices;
  • estimate materials;
  • other required materials.

JavaScript is disabled

Therefore, before sending it for examination, a set of adjusted design documentation must be checked for compliance of previously adjusted and developed sections (including by the original designer) with the current regulatory requirements with documentary evidence of this compliance - additional registration of all volumes of documentation with cover pages with signatures of persons responsible for the project.

After the first adjustment carried out by us, a positive conclusion from the State Examination Committee was also issued. Unchanged volumes were presented for examination as they were released by the previous design organization and sections corrected by us, indicating the changes made with our title sheets and the sheets replaced by our designers.

How does the final version of the Boguchanskaya HPP project differ from the original one?

In the area where the rockfill dam adjoins the right bank of the Angara there will be an additional fish-inhabited reef complex, which will provide fish with favorable conditions for feeding, wintering and spawning, as well as the opportunity to independently go to the upper reaches of the reservoir.

Each of these innovations has a serious justification and significantly improves the characteristics of hydroelectric power plants. For example, the second spillway has greatly increased the reliability of the station, which is no longer afraid of abnormal floods. Without a backup spillway, technical problems could theoretically arise during the operation of the hydroelectric power station. Now, when floods and floods pass, two spillways can come into operation.

Land surveying project and territory planning project: characteristic properties and differences

The outcome of the hearing will decide the issue. It can be both positive and negative, which is due to the objective nature of the situation in the land zone planned for design. Here it is important to consider a number of factors that can influence seismic processes and the overall background of the landscape.

In cities such as Moscow and St. Petersburg, there are already quite a lot of such violations. For these cities, the highest possible requirements are provided for the development of land surveying and planning projects, in order to not only comply with the required regulations, but also correct existing shortcomings.

Tips for equity holders: what to do when the area of ​​the apartment differs from the design one

Therefore, the possibility of changing the refill price either up or down depends solely on the terms of your contract. Carefully re-read your share participation agreement (and if you bought an apartment by assigning the rights of claim, also look at the assignment agreement). Typically, all issues related to price recalculation are written down in the “Contract Price” section. If nothing is written there at all about the possibility of adjusting the price, this means that neither you nor the developer can demand additional payment in connection with a change in area.

With this option, the price of replenishment will change only if the actual area deviates from the design one up or down by more than 1 square meter. That is, if the deviation of the area does not exceed 1 sq.m., the payment under such an agreement will not be recalculated.

What is the fundamental difference between a project (stage P) and working documentation (stage RD) because both have an explanatory note, diagrams, plans, specifications

The “Project” stage represents the main approved design stage reconstruction and construction projects, on the basis of which construction permits are obtained and an updated estimate for the work is calculated. The “Project” stage, in fact, is the embodiment of the general technical specifications.

In accordance with Decree of the Government of the Russian Federation dated February 16, 2008 No. 87 “On the composition of sections of project documentation and requirements for their content,” design documentation for capital construction projects for industrial and non-industrial purposes consists of 13 sections:

Reconstruction and major repairs - what's the difference?

Consequently, the main difference between major repairs and reconstruction is interpreted by the Town Planning Code as carrying out work that concerns load-bearing structures or not. If, for example, repairs and reconstruction of wooden houses are carried out, then in the first case it is possible to replace, for example, windows, doors, heating systems, hot water or cold water, etc. And during reconstruction, floors can be completed, rooms can be added, remodeling and other work affecting the load-bearing elements and structures of the object can be carried out.

By reconstruction of property we mean the transformation of a global purpose with a change in various parameters. For example, the number of floors of a building or its height, as well as its area, can be changed, including extensions, reconstruction, extensions, and expansion of volumes. Linear objects are also an exception.

Difference between Photoshop and Illustrator

Photoshop, as we noted above, is intended for editing mainly raster images. That is, those pictures that are built from pixels and have a fixed resolution. Editing a picture is carried out by Photoshop, like any other “raster” program, through low-level adjustments to the colors of the image.

Thus, Photoshop involves working with a project placed on only one canvas - a window in which certain graphic elements are located. Illustrator allows you to distribute edited images across several vector platforms for graphics processing.

Home page

The purpose of work schedules, on the one hand, is to detail the site schedule and, on the other, to provide a timely response to all sorts of changes in the situation at a construction site. Work schedules are the most common type of scheduling. As a rule, they are compiled very quickly and often have a simplified form, i.e., as practice shows, they are not always properly optimized. Nevertheless, they usually take into account the actual situation at a construction site better than others, since they are compiled by persons directly involved in this construction. This especially applies to taking into account weather conditions, the peculiarities of interaction between subcontractors, the implementation of various rationalization proposals, i.e. factors that are difficult to account for in advance.

Consolidated calendar plan (schedule) in the PIC determines the order of construction of objects, i.e. the start and end dates of each project, the duration of the preparatory period and the entire construction as a whole. For the preparatory period, as a rule, a separate calendar schedule is drawn up. Existing standards (SNiP 12-01-2004 to replace SNiP 3.01.01-85) provide for the preparation of calendar plans in monetary form in the POS, i.e. in thousand rubles with distribution by quarters or years (for the preparatory period - by month).

08 Aug 2018 153

Quote plemyash_062 07/09/2014 4:02:23

please provide a link to justify it.
--End quote-------
Case 1.
If the need for adjustments arose before the start of work
When adjusting project documentation, one should be guided by the norm of the Law “On Architectural Activities in the Russian Federation” (Article 20).
Article 20. Changes to the architectural design
1. Changes to the architectural project when developing documentation for construction or during the construction of an architectural object are made exclusively with the consent of the author of the architectural project, and in case of deviation from the requirements of the architectural and planning assignment, also in agreement with the relevant body of architecture and urban planning.
That is, the existing practice of involving other designers to adjust a project developed by one team of authors without agreement with the architect-author of the architectural project seems unlawful.
Besides,
SNiP 11-01-95 "INSTRUCTIONS ON THE PROCEDURE FOR DEVELOPMENT, APPROVAL, APPROVAL AND COMPOSITION OF DESIGN DOCUMENTATION FOR THE CONSTRUCTION OF ENTERPRISES, BUILDINGS AND STRUCTURES"
2.11. Customers of design documentation and designers are obliged to promptly make changes to the working documentation related to the introduction of new regulatory documents.
Those. clause 2.11 contains a mandatory provision for making changes to the working documentation related to the introduction of new regulatory documents.
In addition, there is also such a document - “Organization of state examination of design documentation in the Moscow region”
"In the event that construction under the project has not been carried out for 2-3 years, the Customer must, before submitting the documentation for examination, ensure that this documentation complies with the current legislation, regulatory documents for design, as well as extended specifications issued by local supervisory authorities and interested bodies of the local administration (with the involvement of the design organization)."
Therefore, the requirement for designers to adjust already completed design and estimate documentation is legitimate only in the event of changes in regulatory documents.
In this case, the design documentation must be brought in accordance with the new requirements by the customer before construction begins. To do this, the customer enters into a contract or additional agreement with the design organization to carry out work to correct the design documentation.
But, since adjusting the design and estimate documentation requires a new designation, the adjusted documentation is essentially a new type of documentation, executed by a different author and requiring a new approval.

Case 2.
If work has already begun
Civil Code of the Russian Federation. Article 744. Amendments to technical documentation
1. The customer has the right to make changes to the technical documentation, provided that the additional work caused by this does not exceed ten percent of the total cost of construction indicated in the estimate and does not change the nature of the work provided for in the construction contract.
2. Changes to the technical documentation greater than those specified in paragraph 1 of this article are made on the basis of an additional estimate agreed upon by the parties.
At the same time, the need for coordination between the customer and the designer of changes made to the technical documentation carried out in accordance with the Civil Code of the Russian Federation has not been determined.
In cases where changes in standards occurred after the start of work, and making the necessary changes to the project entails significant and inadequate costs for the customer during their implementation, it is recommended to follow clause 3.5 of SNiP 11-01-95, having received permission to use the expired standard from the body that approved the new norm.
3.5. Justified deviations from the requirements of regulatory documents are allowed only with permission from the authorities that approved and (or) put these documents into effect.
Therefore, the requirement for designers to adjust already completed design and estimate documentation for objects whose construction has begun, is underway, or resumes after suspension or mothballing is legal only in the event of changes in regulatory documents and the absence of approval for the execution of work on an already completed project .

During the construction process, deviations from the decisions made sometimes arise not only at the initiative of the customer or designer. The technical side of making changes to the working documentation is reflected in GOST 21.1101-97.
In this case, it is necessary to distinguish between making changes to working and design documentation.

Extracts from GOST R 21.1101-97
7.1 Amendments to working documentation
7.1.1 General
7.1.1.1 A change to a working document previously transferred to the customer is any correction, exclusion or addition of any data to it without changing the designation of this document.
The document designation may be changed only if different documents are mistakenly assigned the same designations or an error is made in the document designation.
Changes to calculations are not permitted.
7.1.1.2 If changing the document is unacceptable, then a new document with a new designation must be issued.
7.1.1.3 Any change in a document that causes any changes in other documents must be simultaneously accompanied by corresponding changes in all related documents.
7.1.1.4 Information about changes to a document is indicated in the title block of this document, in the general data on working drawings and on the title page (if any).
7.1.1.5 Changes are made to the original document.
7.1.1.6 When changes are made to the original electronic document, any change is indexed as a new version of this document.
7.1.1.7 Copies of sheets (modified, additional and issued instead of replaced sheets) of working documentation are sent to organizations to which copies of documents were previously sent, along with copies of general data of the corresponding main set of working drawings, specified in accordance with 7.1.3.
7.1.2 Permission to make changes
7.1.2.1 Changes to a document (including its cancellation) are carried out on the basis of a permission to make changes (hereinafter referred to as the permission), drawn up in accordance with Forms 9 and 9a of Appendix L.
7.1.2.2 The permit is approved by the head of the organization that developed the document or another authorized official.
Permission is the basis for obtaining original documents and making changes to them.
It is allowed to send a copy of the permit to the customer along with copies of the amended documentation.
7.1.2.3 Changes to each document (for example, the main set of working drawings, specifications of equipment, products and materials) are issued with a separate permit.
It is allowed to draw up one general permission for changes made simultaneously to several documents, if the changes are interrelated or the same for all documents being changed.
7.2 Amendments to design documentation
7.2.1 Changes to the design documentation previously transferred to the customer, as a rule, are made in an automated way and are carried out:
- replacing, adding or excluding individual sheets of a volume;
- replacement (re-release) of a volume (part, book) - when it is completely revised;
- release of additional parts or books.
7.2.2 Changes to design documentation are made, as a rule, on the basis of permission to make changes (see 7.1.2). The grounds for making changes may be comments from the customer and approving executive authorities, comments and negative conclusions from non-state and state examination bodies.
7.2.3 When making changes to the design documentation, the provisions of 7.1.1.1-7.1.1.6 and 7.1.3 should be taken into account (taking into account the peculiarities of completing the design documentation).
7.2.4 When completely revising an entire volume, at the beginning of the text part included in the amended volume, it is recommended to provide information about the changes made: the basis for the changes, a brief description of the changes made.
7.2.5 If changes are made to the design documentation on the basis of a negative conclusion of the state examination, then in the “Explanatory Note” section, as an appendix, include a certificate in the form established by the state examination body, describing the changes made to the design documentation. The certificate must be signed by the chief engineer of the project.
7.2.6 Registration of changes to the volume as a whole is carried out in the table of registration of changes in Form 10 of Appendix M, which is placed on its title page and cover.
It is recommended to register changes in the text part of the design documentation in the table for registering changes in Form 11 of Appendix M, which is placed on the last sheet of the text part when making the first and subsequent changes.
Information about replacing sheets of graphic documents is given in the “Note” column of the contents of the volume, performed in accordance with 8.6.
Information about changes to volumes, as well as the release of additional parts of volumes and books, is entered into the list “Composition of project documentation”, carried out in accordance with 8.8.
When making changes, the requirements of 8.5 must be met.
7.2.7 Changes to the approved design documentation related to changes in the parameters of the construction project and the need to re-approve the design documentation are made by decision of the customer on the basis of a new design task or addition to a previously approved design task.

--------------
PeeCee
Sorry for the links to the old SNiP and GOST, it’s just a bummer to fix it, but in the new ones everything is the same. If you want, check it out.

  • The volume and composition of construction processes, costs, costs and expenses for construction, reconstruction, major repairs for delivery to the State Customer.

Adjustment of redistribution, overexpenditure of funds. Accelerating the examination of estimate documentation at the “Detailed Documentation” stage in one or two stages using estimate calculations as part of the technical specifications. The price indicators of the basic cost of construction and the costs of survey work and designer's supervision are maintained. Correction of drawings, construction work reports.

Chapter Price, rub./
from 10000 m2
Note
EPfrom 49Preliminary design. Development of architectural, urban planning and volumetric planning solutions.
AGR Compositionfrom 49*The same without developments - 118 rub./m2Support until certificate of approval is received
AGO Compositionfrom 79*The same without developments - 79 rub./m2
AR 199 If we are developing AGR/AGO, the cost of the AR section will be 148/49 rubles/m2
KR 129
QOL/CM 88/88
CD/KMD 49/49
AC 299
OV - K 88
VC 78
EOM 88
TX 18 - 69

*Customer's developments - preliminary design and/or section of the "AR" project.
  • 〉 Pre-project documentation for Moscow:

      floor plans and explications

      conclusion:

      about the archaeological significance of the territory

      on the historical boundaries of a cultural heritage site

      on engineering and environmental surveys on the territory of the land plot where the facility is located

      fragment of the historical and cultural basic plan of the city of Moscow

      historical information about a cultural heritage object (an identified cultural heritage object or a historically valuable city-forming object)

      obtaining information from the City Register of immovable historical and cultural monuments and their territories

      cadastral certificate for a land plot

      cadastral plan of the land plot

      engineering-topographic plan M 1: 500 (geobase)

      situation plan M 1: 2000

      engineering-geological conclusion on the condition of the soils of the construction site

      development of a technical report based on the results of an engineering survey of the technical condition of the building (structure) structures

      documentation on engineering and geodetic survey of the land plot

      documentation on the inspection of a land plot for compensatory landscaping

      obtaining initial information from the State Unitary Enterprise "Mosgorgeotrest" at the location of the object

      technical conditions for connecting the facility to utility networks:

      placement of the object in the security zone of utilities

      water supply and sewerage

      drain

      heat supply

      gas supply

      power supply

      laying utilities

      relocation of existing utilities

  • 〉 Contents of project documentation (87 PP):

      No. 87 RF PPDesignationSection name
      Project documentation
      1 PZSection 1 "Explanatory Note"
      2 ROMSection 2 "Scheme of planning organization of a land plot"
      3 ARSection 3 "Architectural solutions"
      4 KRSection 4 "Constructive and space-planning solutions"
      5 Section 5 "Information about engineering equipment, engineering support networks, list of engineering activities, content of technological solutions", including:
      5.1 IOS1Subsection 5.1 "Power supply system"
      5.1.1 EM1Part 1 "Power supply. Input device (TP, ASU)"
      5.1.2 EM2Part 2 "Power electrical equipment"
      5.1.3 EM3Part 3 "Lightning protection and grounding"
      5.1.4 EOMPart 4 "Electric lighting (internal)"
      5.1.5 ENPart 5 "External electric lighting"
      5.2 IOS2Subsection 5.2 "Water supply system"
      5.3 IOS3Subsection 5.3 "Water disposal system"
      5.4 IOS4Subsection 5.4 "Heating, ventilation and air conditioning, heating networks"
      5.5 IOS5Subsection 5.5. "Communication networks"
      5.5.1 SKSPart 1. "Structured cabling system"
      5.5.2 SRFPart 2. "Radio system"
      5.5.3 midrangePart 3. "Electric clock system"
      5.5.4 SKPTPart 4. "Collective television reception system"
      5.5.5 STSPart 5. "Telephone system"
      5.5.6 LANPart 6. "Local Area Network"
      5.5.7 MMSPart 7. "Multimedia system"
      5.5.8 ACSPart 8. "Access control and management system"
      5.5.9 SOVNPart 9. "Video surveillance system"
      5.5.10 SOTSPart 10. "Security alarm system"
      5.5.11 SSOIPart 11. "Information collection and processing system"
      5.5.12 SPAPart 12. "Automated parking system"
      5.5.13 SVDTSPart 13. "System for identifying sabotage and terrorist means"
      5.5.14 ASUZPart 14. "Automated building management system"
      5.5.15 SKUPart 15. "Room control system"
      5.5.16 ASDUPart 16. "Data center automation and dispatch system"
      5.5.17 ASUEPart 17. "Automated system for metering electricity consumption, water consumption, heat consumption"
      5.5.18 AOBPart 18. "Automation of the ventilation and air conditioning system"
      5.5.19 ACS central heating centerPart 19. "Automation of the central heating unit control system"
      5.7 IOS7Subsection 5.7 "Technological solutions"
      6 POSSection 6 "Construction Organization Project"
      7 UNDERSection 7 "Project for organizing demolition and dismantling work"
      8 OOCSection 8 "List of environmental protection measures"
      9 PBSection 9 "Fire Safety Measures"
      9.3 AGPTPart 3. "Automatic gas and powder fire extinguishing system"
      9.4 SAPSPart 4. "Automatic fire alarm system"
      9.5 SOUEPart 5. "Warning and evacuation control system in case of fire"
      9.6 SPPAPart 5. "Fire automatic system"
      10 ODISection 10 "Measures to ensure access for people with disabilities"
      10.1 EESection 10 (1) “Measures to ensure compliance with energy efficiency requirements and requirements for equipping buildings, structures and structures with metering devices for energy resources used”
      12 Section 12 "Other documentation in cases provided for by federal laws"
      12.1 Technological regulations for the process of handling construction and demolition waste
      12.3
      12.4 Requirements for ensuring safe operation of a capital construction facility
      12.5 ITM Civil Defense and Emergency Situations
      12.6 Measures to ensure anti-terrorist security
      12.7 Traffic management project
      12.10 SMIS (SMIC, SUKS, SSP)
      12.11 Dendrology
      Working documentation
      1 General plan
      2 Architectural solutions
      3 Constructive decisions
      4 Internal engineering systems, including:
      4.1 Power supply system
      4.2 Water supply system
      4.2.1 Domestic pumping station
      4.2.2 Fire pumping + automatic fire extinguishing system
      4.3 Drainage system
      4.4 Heating, ventilation and air conditioning, heating networks
      4.4.1 Thermomechanical solutions (central heating point)
      4.5 Communication networks. Automation and dispatching of systems
      5 Technological solutions
      6 Security and protective deratization system
      7 Measures to ensure anti-terrorism security
      8 SMIS, SMIC, SUKS
      9 PPR for dismantling work
      10 PPR for the preparatory period
      11 Stroygenplan
      Radiation drainage and CLD
      External networks for heat supply, water supply, household and storm sewerage, low-current sewerage, electricity supply
      Measurement work
      Inspection of load-bearing and enclosing structures
      3D scanning
      Inspection of connection points for external engineering systems
      Color passport of existing buildings
      Album of architectural and urban planning solutions (formation of a regulatory album in accordance with the requirements of the Moscow Architecture Committee)
      Special technical conditions for design and construction regarding fire safety
      Construction supervision
      Author's supervision engineering
      Building Operating Instructions
      Technical regulations on building safety
      Instructions for the operation of engineering systems (TP, ASU, CTP, pumping, ventilation chambers, server rooms, etc.)
  • 〉 Coordination and approval of project documentation:

      OPS GBU "Mosgorgeotrest"

      JSC:

      "Mosvodokanal"

      "Mosgaz"

      State Unitary Enterprise of Moscow:

      "Mosgortrans"

      NIiPI General Plan

      "Mosvodostok"

      "Moscow subway"

      "Mossvet"

      PJSC:

      Moscow Cable Network (MKS)

      Prefectural districts

      GBU "Zhilishchnik" district

      District government

      Office of Urban Planning Regulation of the Administrative District (UGR)

      Moscow City Heritage

      UPSP Moskomarkhitktury

      Rostekhnadzor (Mosenergonadzor)

      Moscow City Department:

      Transport

      Healthcare

      Education

      Social protection

      GKU TsODD

  • 〉 Stages of work:

      Free consultation

      Signing the contract

      Delivery of initial data for design

      Coordination of the project with the customer

      Coordination or support of the project with competent organizations

      Delivery of project documentation to the Customer.

  • 〉 Agreement:

      Name of serviceDates / months / from.Cost, rub. / from.
      Coordination:
      1. Construction2 150 000
      2. Project documentation4 150 000
      3. Construction with the airport and the Federal Air Transport Agency4 300 000
      Alteration:
      1. PZZ8 negotiable
      2. Master plan8 negotiable
      3. GPZU with the necessary TEP4 150 000
      Receipt:
      1. Technical conditions2 100 000
      2. Commissioning permits4 150 000
      3. Initial - permitting documentation4 150 000
      Services for developers4 150 000
      Passing the state examination2 30 000
      Legalization of unauthorized construction4 150 000
      Technical customer services- negotiable
      Registration of a building permit2 60 000
      Registration of real estate objects for cadastral registration2 60 000
  • 〉 Coefficients of MU No. 620 dated December 29, 2009:

      Reduced deadlines:

      10% - 1.2 times, clause 3.11.

      30% - 1.4 times, clause 3.11.

      40% - 2 times or more, clause 3.11.

      Major renovation:

      50% - development of design (working) documentation for major repairs, clause 3.5.

      Linking standard or reused design documentation without making changes:

      65% - above-ground part, clause 3.2.

      80% - above-ground and underground parts, clause 3.2.

      50% - unique objects, clause 3.3.

      50% - reconstruction and technical re-equipment, clause 3.4.

      Other:

      2% - performing the function of general designer, clause 3.9.

      30% - design with installation of imported main technological equipment used by the design organization for the first time, clause 3.8.

Cost calculator for adjusting design estimates per m2
Select building type

Retail buildings Retail MFC Administrative Industrial Warehouse MFC Residential buildings

M2:

Design cost calculation
Cost of design work by main sections
from 10,999 m2, Vstr=31,892 m3
"P" "RD"
p 1 "Explanatory note" 0 0
r 2 "Scheme of planning organization of a land plot" 0 0
p 3 "Architectural solutions" 0 0
p 4 "Constructive solutions" 0 0
r 6 "Electricity supply" 0 0
r 7 "Water supply system" 0 0
p 8 "Water disposal system" 0 0
R 9 "Heating, ventilation and air conditioning, heating networks" 0 0
p 10 "Communication networks" 0 0
r 11 "Gas supply" 0 0
p 12 "Technological solutions" 0 0
r 13 "Construction organization project" 0 0
R 14 "List of environmental protection measures" 0 0
R 15 "Fire safety measures" 0 0
R 16 "Measures to ensure access for people with disabilities" 0 0
R 17 “Project for organizing work on demolition or dismantling of capital construction projects”
(if demolition or dismantling is necessary) (POD)
0 0
r 18 "Estimate documentation" 0 0
R 19 "Engineering and technical measures for civil defense and emergency situations" (if necessary) 0 0
r 20 "Traffic Management Project" (if necessary) 0 0
p 21 "Justification of measures to comply with the required heat-protective characteristics of enclosing structures" (Energy efficiency). 0 0
R 22 "Requirements for ensuring safe operation of the facility" 0 0
R 23 "Technological regulations for the management of construction waste" 0 0
TOTAL by sections: 0 0
TOTAL:0
Tables of the relative cost of developing design documentation (as a percentage of the price), for the following design stages:The cost of developing project documentation as a percentage of the price

The cost of adjusting design estimates
  • Justification for adjusting design and estimate documentation;
  • Cost of design work ____;
  • Work completion time ____ days;
  • Prepayment 50% (advance payment), final payment according to the act.

Requirements:

  • The cost of design work should not exceed the starting cost;
  • The design and estimate documentation is transferred to the Customer in 1 copy according to the invoice, payment is made according to the as-built estimate and the certificate of completion of work;
  • Estimate documentation is carried out in accordance with the current regulatory framework for TER, FER is transferred to the Customer in 1 copy and in electronic form.

Scope of work:

  • Make adjustments to design and estimate documentation by sections.

Preliminary
TECHNICAL TASK
to carry out work to adjust design and estimate documentation

1 Functional purpose of the object
2 Type of constructionReconstruction
3 Budget
4 Staged designWorking documentation
5 Survey results
6 Project organization
7 State customer
8 TEPThe total area of ​​the object is ___m2.
9 Requirements for engineering surveys
10 Technical conditions for connecting utilities
11 Requirements for estimates
12 Author's supervision
13 Requirements for engineering communications
14 Additional requirementsPrepare a bill of quantities.
15 Initial data for design
16 Turnaround timeStart of work: Completion of work: